To use IRIS metrics—and the resulting data—as part of the investment management process, IRIS metrics should be used and analyzed in generally accepted sets and according to well-defined objectives. To access generally accepted Core Metrics Sets by Theme or Sustainable Development Goal (SDG), set up a profile.
-
Learning Hours (PI1836)
Number of learning hours provided to students during the reporting period.
-
Learning Hours Provided: Type (PD9173)
Describes the type of learning time provided through the organization's products/services during the reporting period. Choose all that apply (see usage guidance for definitions): School time Instructional…
-
Legal Structure (OD2999)
Describes the legal structure of the organization. Select one: Benefit Corporation Co-op Corporation Limited Liability Company Nonprofit/Non-Governmental Organization Partnership Sole-proprietorship Other
-
Length of Adjacent Protected Land (PI2135)
Length of protected land boundary shared with the organization's protected land as of the end of the reporting period.
-
Length of Coastline Present (PI5840)
Length of marine or freshwater coastline present during the reporting period on protected land, land under sustainable stewardship, or land under sustainable cultivation.
-
Length of Coastline Restored (PI2538)
Length of marine or freshwater coastline under management for ecological restoration on protected land, land under sustainable stewardship, or land under sustainable cultivation during the reporting period.
-
Length of Road Built or Improved (PI5587)
Length of road built or improved by the organization during the reporting period.
-
Length of Streams Present (PI3239)
Length of freshwater streams present during the reporting period on protected land, land under sustainable stewardship, or land under sustainable cultivation.
-
Length of Streams Restored (PI6885)
Length of freshwater streams under management for ecological restoration on protected land, land under sustainable stewardship, or land under sustainable cultivation during the reporting period.
-
Length of Transmission Lines Built or Improved (PI4515)
Length of transmission lines built or improved by the organization during the reporting period.
-
Level of Stream Connectivity (PI3113)
Describes the level of fragmentation of streams—the extent to which streams and rivers are fragmented into unconnected parts—present on land directly or indirectly controlled by the organization as of…
-
Level of Water Stress (OI2799)
Level of baseline water stress on land directly or indirectly managed by the organization as of the end of the reporting period. Choose all that apply: Low (<10%) Low-medium (10–19.9%) Medium-high (20–39.9%) High…
IRIS Version 5.3